Prefabricated Carbon Steel Shed Industrial Plant Workshop Warehouse Steel Structure
Prefabricated steel structure warehouses with Q235/Q355 steel. High strength, corrosion & fire resistance. Fast modular construction reduces build time by 50%. Custom designs for various climates and applications.
prefabricated carbon steel shed
,industrial steel structure warehouse
,steel workshop with warranty
Product Description:
For the construction of our prefabricated steel structure warehouses, we utilize high-strength steel and standardized prefabricated components. Our modular design enables rapid construction, reducing the construction period by over 50% compared to traditional methods, helping you achieve efficient production. The overall structure boasts excellent corrosion and fire resistance, low maintenance costs, making it a long-term asset for cost reduction, efficiency improvement, and operational security.

Design Capability

Specifications:
|
Steel Structure |
Material |
Details |
|
Main Structure |
Frame Columns and Beams |
Q235/Q355 Equivalent to S355JR, ASTM A572 Grade 50 |
|
End Wall Column |
Q235/Q355 |
|
|
H-beam welding(columns and beams) |
Automatic Submerged Arc Welding |
|
|
Rust Removal |
Shot Blasting |
|
|
Surface Processing |
Alkyd Paint/Epoxy Zinc Rich/Galvanized |
|
|
High-Strength Bolt |
Grade 10.9/8.8 |
|
|
Common Bolt |
Grade 4.8 |
|
|
Secondary Structure |
Flange Brace |
Angle Steel |
|
Horizontal Support |
Angle/Round Steel |
|
|
Vertical Support |
Angle/Round Steel |
|
|
Tie Rod |
Angle/Round Steel |
|
|
Tie Bars |
Round Steel/Casing/Shaped Steel |
|
|
Purlin |
Galvanized Z-beam/C-beam |
|
|
Enclosure system |
Roofing Materials |
360°Locking Seam System |
|
Daylighting Band |
FRP Plate |
|
|
Gutter (inside/outside) |
Stainless Steel/Colored Steel Plate |
|
|
Rain Pipe |
PVC Pipe/Colour Steel Rainwater Pipe |
|
|
Wall Materials |
Locking Screw System / Composite Panel Wall / Rockwool Maintenance System |
|
|
Accessories |
Sealant, Self-tapping Self-drilling Screws, etc. |
|
|
Edge Flashing |
Color Plate/Stainless Steel |
|
|
door |
Electric Rolling Door/Sliding Door/Fireproof door/Industrial Sliding Doors / Industrial Lift-Up Doors / Industrial High-Speed Stacking Doors / Aluminum |
Custom |
|
Windows |
Aluminum Alloy/plastic Steel Window/Fireproof Window |
Custom |
Rigorous Quality Inspection
Advantages Of Warehouse Steel Structure:-
Large span, high clear height, column-free space, and higher utilization rate.
-
Q355 high-strength steel, strong load-bearing capacity, and excellent stability.
-
Significantly shortened construction cycle, enabling earlier completion, earlier use, and earlier returns.
-
Minimal construction waste during building, environmentally friendly.
Applications:
The steel structure warehouse is primarily used for Industry, commerce and agriculture. It provides a secure and cost-effective environment for bulk goods, agricultural products, machinery, and raw materials. Due to its prefabricated modular design, it can be expanded easily, making it suitable for e-commerce storage centers, cold storage facilities, and regional distribution hubs. Its weather-resistant materials ensure stable performance in tropical, desert, or snow-prone areas, offering businesses long-term reliability for large-scale inventory storage.

Product material

ArtisanStructure is a national high-tech enterprise boasting multiple core technologies. Based in Shenyang, a core city of China’s old industrial base, it has accumulated over 20 years of professional technical experience and remains committed to crafting high-quality prefabricated metal products. Its product range covers various Industrial, commercial and agricultural steel structure buildings, workshops, stadiums, mobile houses and all types of tent.
Liaoning Province. includes:
- Artisan Metal Structures(Liaoning) Co., Ltd.
- Artisan Architectural Technology (Shenyang) Co., Ltd.
- ArtisanStructure Engineering Technology (Shenyang) Co., Ltd.


Q: Is your pricing competitive compared with other suppliers?
A: Our goal is to offer the best price for the same quality, and the best quality for the same price. We strive to lower your costs and ensure you receive the highest value for what you pay.
Q: Can you send engineers or a full team to install my project?
A: We will provide detailed installation drawings and videos free of charge. If requested, we can dispatch engineers as installation supervisors or send a full installation team.
Q: What is the delivery time?
A: The lead time depends on the order quantity. Normally, delivery will be completed within 15 to 60 days.
Q: How can I obtain a quotation for my project?
A: Feel free to send me a message here or contact me by email. I will respond as soon as possible. You are always welcome to reach out for your building project!
Q: Is a sample available?
A: Yes, we are glad to provide samples. Samples are free, and you only need to cover the freight cost.
Q: Are the products tested before shipment?
A: Yes, every batch is inspected before delivery to ensure all items meet the required standards.
Q: How do you maintain long-term and good business relationships?
A: We consistently deliver high quality and competitive prices to ensure mutual benefit. We value every customer as a friend and sincerely conduct business with them, regardless of where they come from.
Q: How do you ensure the product supplied matches exactly what I need?
A: Before confirming the order, our sales and engineering teams will provide suitable solutions based on your requirements. We can also offer free 3D drawings to help you clearly understand the proposed solution.
Q: What are the core advantages of steel structure buildingcompared with concrete structure?
A:1 High strength-to-weight ratio: 40% weight reduction, lower foundation cost;
2 Short construction cycle: no maintenance period, construction as usual in rainyseasons:
3 Environmentally friendly and recyclable: steel recycling rate of 90%, dust pollu-tion reduction of 75%.Particularly suitable for warehouses, multi-storey factories and other large-span s-pace demand scenarios.
Q: Is the maintenance cost of steel structure plant high?What routine maintenance is needed?
A: The annual maintenance cost is only 0.8%-1.2% of the construction cost, mai-nly including:Checking the tightness of bolts and rustproof layer every 2 years.Fire retardant coating every 5 yearsChecking the drainage system after a storm
Q:Can we customize the steel structure design accordingto the special climate conditions (e.g. hurricane, earth-quake zones) of the customer's country?
A:Yes, we can provide customized steel structure design for special climatic con-ditions in customer's country to ensure that the structural safety performancemeets the needs of Party A and the requirements of local regulations, and at thesame time, we can provide supporting solutions for anti-corrosion and weather-ability optimization of materials.
Scan to add on WeChat