Customized Design Steel Structure Stadium Rapidly Install Prefabricated Sports Building
Prefabricated Steel Structures for Beautiful Rapidly Installed Sports Venues Product Description The gymnasium is a contemporary public building, with a main load-bearing framework built from high-strength steel, and a roof adopted aluminum-magnesium-manganese metal alloy panels, paired with a lightweight enclosure system like colored profiled steel plates. It can create large-span, column-free flexible spaces, and the roof boasts a durability of up to 100 years. Advantages
Steel Structure Stadium Design
,Customized Prefabricated Sports Building
,Customized Design Metal Sports Building
The gymnasium is a contemporary public building, with a main load-bearing framework built from high-strength steel, and a roof adopted aluminum-magnesium-manganese metal alloy panels, paired with a lightweight enclosure system like colored profiled steel plates. It can create large-span, column-free flexible spaces, and the roof boasts a durability of up to 100 years.

- Eco-friendly recyclable components
- Short construction schedule
- Adaptable to mezzanine and multi-level use
- Cost-effective for large footprints
- Pre-cut openings for doors and windows to reduce onsite cutting
Steel structures, with their high strength, light self-weight, and excellent seismic resistance, have become the ideal construction solution for large-span sports venues. Their components can be prefabricated in factories and rapidly assembled on-site, significantly shortening construction cycles to meet the demands of efficient venue development. Large-span steel trusses or cable-net systems effortlessly create column-free open spaces, accommodating diverse functions such as spectator events, training, and fitness activities.
Translated with DeepL.com (free version)

Our core philosophy centers on design and prioritizes technology as the driving force, with dedicated engineers and designers pursuing excellence, upholding strong R&D capabilities and relentless innovation, while swiftly responding to custom design needs. Equipped with leading BIM/structural tools—Auto CAD, Tekla Structures, Autodesk Revit, Rhino, 3D3S Design, PKPM, SAP2000—we optimize the non-construction-focused EPC journey, selecting green materials, integrating energy-saving tech, and delivering designs meeting international standards for stadiums, warehouses, industrial plants, and specialized scenarios.

| Items | Part | Specification |
|---|---|---|
| Main materials | Main structure | Q355 Welded H beam and column (equivalent to S355JR, ASTM A572 Gr. 50) |
| Secondary structure | Q235(equivalent to S235JR, ASTM A36) | |
| Roof system | Single steel sheet & Insulation sandwich panels (PU, rock wool and EPS) | |
| Processing | Coating | Paint (Primer, Intermediate coat, Top coat) |
| Fire retardant coating | Fire resistance 1.5h | |
Artisan Metal Structures Co., Ltd. is a national high-tech enterprise boasting multiple core technologies. Based in Shenyang, a core city of China’s old industrial base, it has accumulated over 20 years of professional technical experience
Liaoning Province. includes:
- Artisan Metal Structures(Liaoning) Co., Ltd.
- Artisan Architectural Technology (Shenyang) Co., Ltd.
- ArtisanStructure Engineering Technology (Shenyang) Co., Ltd.


Among our diverse offerings are workshop,warehouse,factory,commercial building, civil building, agricultural building and prefabricated house which are meticulously designed to meet almost any conceivable need.


Packaging and Shipping

FAQ
A: Plan drawing, elevation drawing, sectional drawing, foundation drawing, construction drawing and installation drawing.
Q2: What is your terms of payment?
A: After the production of steel structure, we will find a third party inspection agency to inspect our welding and provide a flaw detection report.
A: Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas.
A: The 40-foot open-top container does not require additional steel pallets while the 40-foot high cube container needs to add additional steel pallets during transportation.
Q6: What is the lead time?
A: Typically 20-30 days after order confirmation, depending on project size.
Q7: Do you offer installation services?
A: We provide detailed installation manuals and can send engineers for on-site support if needed.
Scan to add on WeChat