Project in Carabasasn Texasn logistic Fabricated warehouse

2025-11-06
Project Overview:
Project Name: 5,080-square-metre Steel Structure Logistics Centre in a Carabasasn Texasn
Completion date: December 2021 (full cycle from design to final handover)
Project scale: Total floor area of 5,080 square metres, prefabricated building height of 12 metres, encompassing goods storage areas, sorting zones and ancillary mezzanine offices. The design load capacity accommodates the operational requirements of heavy-duty logistics warehouse equipment.
Core Materials and Processes: The main structure employs Q355B high-grade steel, innovatively integrating welding techniques with high-strength bolted connections to balance structural stability and assembly efficiency.
Core Challenges and Difficulties in Steel Structure Warehouse Projects:
  1. Challenges in Cross-Border Standard Adaptation: Differences exist between the target country's building codes and fireproofing/anti-corrosion standards for steel structures buildings and those in China. Exporting steel structure must simultaneously meet both Chinese quality standards and local project acceptance requirements, presenting significant technical alignment difficulties.
  2. Cross-border logistics and time pressure: With project components totalling over 1,200 tonnes, including numerous bespoke irregularly shaped parts, moisture protection, deformation prevention during long-distance sea transport, and timely delivery emerged as critical challenges.
  3. The integration of these processes demands high precision: the weld quality of Q355B steel directly impacts the steel structural load-bearing capacity, while the accuracy of bolted connections determines assembly efficiency. The synergy between these two techniques must achieve a structural outcome that combines rigidity with flexibility.

aktueller Firmenfall über [#aname#]

Project Outcomes and Client Feedback
  1. The project of prefabricated warehouse was completed 15 days ahead of the contractual schedule and passed the local construction quality supervision department's inspection in one go. All indicators exceeded local acceptance standards, with a 100% compliance rate in structural load-bearing capacity testing.
  2. The combined welding and bolting process solution enhanced on-site assembly efficiency by 30%. The rational utilisation of Q355B steel and process optimisation reduced the client's project costs by 12%.